[Area 1] [Area 2] [Area 3] [Area 4]

     Area No.4 / Hyundai Heavy Industries Co.

     

Dock/Quay

Berthing Capacity

Length
(M)

Depth
(M)

Beam
(M)

Crane/Service

Remark

Tonnage

Number

1 Dock

500,000

-

390

12.7

80

300Ton crane x 2

Building Dock

2 Dock

700,000

-

380

12.7

80

30Ton crane x 3

3 Dock

1,000,000

-

380

13.4

92

450Ton crane x 2
150Ton crane x 1
18Ton crane x 1

4 Dock

450,000

-

295

12.7

65

5 Quay

25,000

-

720

12

65

200Ton crane x 1
150Ton crane x 2

6 Quay

150,000

-

195

12

43

80Ton crane x 2

7 Quay

15,000

-

870

11

25

-

8 Quay

400,000

-

825

12.7

70

30Ton crane x 2

9 Quay

400,000

-

1030

12.7

70

900Ton crane x 1

Ship-lift

 

 

130

-

20

60Ton crane x 1
30Ton crane x 1 

Mipo 1 pier

10,000

1

130

9.0

-

Steel plate/angle, engin plant cargo

Loading
/discharging

Mipo 2 pier

10,000

1

80

90.

-

 

 

Mipo 3 pier

10,000

2

503

7-9

-